Request A Quote

Close
  • Request A Quote
  • How long does it take to install a high-volume tank?

    Traditional concrete reservoirs of 1 million litres can take months to cure, but SBS Tanks specializes in “Rapid Deployment.”

    • Speed: A 1-million-litre SBS tank can be fully installed and commissioned in approximately 18 to 21 days. Smaller tanks (under 500kL) can often be completed in as little as one day on-site.

    • No Heavy Machinery: Because the panels are modular and flat-packed, they can be transported and assembled in remote locations or tight urban spaces without the need for cranes or heavy-duty road access.

    • Immediate Use: Commissioning can take place immediately after assembly, as there is no curing time required for the structure itself.

    SBS East Africa